15.08.2017, 19:07 4326

According to the state program, 85 buildings will be commissioned in Almaty in 2017

Besides, within the framework of the implementation of Nurly Zher program, this year 85 buildings with a total area of 216.8 thousand m2 or 4,198 apartments will be commissioned, including construction of 73 buildings through the Mayor Administration within the framework of this state program, 24 of which will be completed this year.
Almaty. August 15. Kazakhstan Today - The Mayor Administration of Almaty held a meeting on the realization of state and government programs, - Kazakhstan Today reports.

During the meeting, the Mayor of Almaty Bauyrzhan Baibek gave several official instructions on achieving benchmarks of programs and solving problem issues, paying special attention of the heads of departments and city districts on the need of strengthening control over the quality of production and compliance with deadlines of facility commissioning. Following the results of 7 months of this year, all programs achieved basic meaning, including in the field of development of health care, education, Rukhani Zhangyru, etc., - Press Service of the Mayor of Almaty reported.

According to the Press Service, in the city, within the framework of Nurly Zhol State Program for Infrastructure Development, the work is managed in three directions: modernization, reconstruction and construction of infrastructure for housing and utilities sector and heat supply, water supply systems and drainage. Since 2015, 81 km of engineering networks have been built to provide Sayaly, Zhas Kanat, Algabas-1 micro-districts and objects of the Universiade with the necessary infrastructure, 13.9 km of engineering networks were reconstructed. This year, objects are reconstructed at the amount of 9.9 billion tenge that will reduce a wear-out by 1.5%, losses by 2.3%, fault rate by 3.2% compared to 2016. During implementation of the program, more than 2,400 work places were created.

Besides, within the framework of the implementation of Nurly Zher program, this year 85 buildings with a total area of 216.8 thousand m2 or 4,198 apartments will be commissioned, including construction of 73 buildings through the Mayor Administration within the framework of this state program, 24 of which will be completed this year.

According to the Regions Development Program till 2020, 141 km of new water supply networks and 96 km of sewerage at the amount of 4.8 billion tenge have been built since 2015. In total, over 2016 year, 467.2 km of engineering networks were built and reconstructed. In 2017 it is planned to build and reconstruct 545 km of engineering networks: water supply, drainage, gas supply, electricity supply, heat supply. In the framework of the Program, last year 37 buildings were repaired and 47 elevators were replaced. In 2017, 245 buildings will be repaired (replacement of 199 elevators in 94 buildings and repair of entrances, facades, roofing in 151 buildings).

Also the Press Service informed that within the State Program of Industrial and Innovative Development, 100 projects at the amount of 190 billion tenge with creation of 12,000 workplaces are included into the Almaty Business Support Map. Since 2015, 33 projects at the amount of 35.6 billion tenge with creation of 2.7 thousand new workplaces have been launched. All enterprises work according to plan with a capacity of 70% or more. By the end of the year, it is planned to launch another 22 projects at the amount of 59 billion tenge with creation of more than 2 thousand workplaces.

In the framework of the DKB 2020 Business Support and Development Unified Program, in 2015 and 2016, 448 projects were supported with creation of 2.5 thousand new workplaces. At the same time, 15.5 thousand workplaces were kept. In this year, 4.4 billion tenge was allocated for subsidies, guarantees and grants. As a result, 1.6 thousand workplaces were created, 7.3 thousand workplaces were kept, - the Mayor Administration confirmed.

Since 2015, 10.7 billion tenge was allocated to Zhibek Zholy regional program on a parity basis with Damu Fund, with the support of 175 projects. The participants of the program for 2016 - 2017, 1.2 billion tenge have already paid for taxes; 550 new workplaces were created, 1.2 thousand workplaces were kept.

Following the results of 7 months, the number of Small and Medium Enterprises in the city grew by 7.3% and amounted to 172.9 thousand. The number of employed in Small and Medium Enterprises for the 1st quarter of 2017 amounted to 581 thousand people, with growth of 2.4%.

According to the results of 7 months of this year, all programs achieved basic meaning, including in the field of healthcare development, Rukhani Zhangyru, etc. For example, in 2016, according to the Program for the Development of Education and Science in Almaty, first-grade schoolchildren were provided with free textbooks and academic and methodological complexes at 100%. In 2017, the second, fifth, seventh classes will have updated content of education. This year, according to the results of the Unified National Testing, the students of the city take the first place in the republic for the sixth year in a row. The maximum results have been achieved for other indicators of the program, - the Press Service concluded.


This information may not be reproduced without reference to Kazakhstan Today. Copyright of materials of News Agency Kazakhstan Today.
Found an error in the text?

Select the error and press Ctrl + Enter at the same time.

relevant news

Most viewed